Reference projects
In the course of Lakome Oy, we have been involved in numerous customer
projects which were all different in amplitude and character. In
brief, the project’s target has been the planning or development
of a single device. At large, the customer-delivery is carried out
with the production line execution’s turn-key contract.
Our company’s service is audited by ia Agco group/Valtra
Oy Ab, Eurenco Vihtavuori Oy, Oy Forcit Ab Vihtavuori and The Finnish
Defence Forces. They have also accepted us to be their machine supplier.
Our customers are i.e.: CP Kelco Oy, Eurenco Vihtavuori Oy, Forcit
Oy, Junttan Oy, Lahden Autokori Oy, the Armed Forces of Finland
(Haapajärvi armoury), as well as Valtra Oy Ab Power transmission
plant. Next, we have listed several of our executed customer projects
from along the years.
THE RATIONALIZATION OF PRODUCTION PROCESSES
Total deliveries
- RN- primer production’s development project: layout-,
method- and device planning, as well as implementations. Application
of automaton-cells’ to productional function.
2005- 2006 [Automaton-cells into electric explosion primer production
(3 pcs.) 2005-2006,
electric explosion primer’s connection-bushing branding
device ( 5 pcs.) 2006]
- Bus bodywork production’s development project: layout-,
method- and device planning, as well as implementations. Body
framework’s welding jigs changed, so that in a latter stage
the use of a welding robot is possible. 2006-2007
Device- and machine planning
Explosive agent industry
- Kemite explosive: Mixing- and charging apparatus’s preliminary
report 2001
- Fuse head’s resistance welding table’s mechanics
and electrification: planning and programming 2001
- Kemite auto: preliminary planning project 2002
- Gunpowder compressor’s hydraulics component-level function,
report of parts catalogue and graph 2002
- Gunpowder compressor’s hydraulics’ malfunction check
and failure-analysis 2002
- Development project accompanying the gunpowder compressor’s
function 2003
- Revision planning of primer production’s reeler machine
2004
Vehicle industry
- Assembly tables’ development for hydr. motors production
line 1998
- Hydraulic rotary machine’s assembly devices for production
1998
- Assembly- and trial run base for hydraulic motors 1999
- Transmission system’s assembly carriage planning 1999
- Hydraulic valve blocks’ assembly- and handling carriage
1999
- Hydraulic motors’ assembly position 2001
- Transmission module’s (800 kg) hoisting device, automatic
counter, and rotating device for assembly production 2001
- Heavy-duty gearing axels and cogged wheels’ transportation
stand planning 2001
Wood processing-industry
- CMC- production’s chemical pulp bales’ reception-,
transportation-, and handling line’s device-planning 1998
- Machine tool’s chip guard and dust shield 2003
Other fields
- Planning the electrification of spare part centre’s overhead
crane 1998
- Planning of swing jib crane for 250 kg load 1999
- Planning and programming the mounting-hydraulics of milling
machines’ part 1999
- Planning of cutting coolant tank ( capacity about 13,5 m3) 2002
- Planning of adjustable rear head-cup of heavy-duty edging press
2002
- Preliminary planning for flowerpot’s foil-wrapping device
2004
- Valve block’s lifting-bail for hydraulics (500 kg) 2004
- Valve block’s planning in 2D- and 3D- forms, valves on
surface-installation or cartridge technique 2005
- Testing instruments for the Armed Forces 2005-2006
Method planning
Explosive agent industry
- Account of costs for gunpowder production’s boxing-line
change 2003
- Gunpowder plant’s small-can packing department development
project 2005
Vehicle industry
- Planning of assembly production’s centralized hydraulic
compression line (incl. electrification) 1998
- Planning of power transmission module’s assembly production’s
flushing circulation system (8 m3- tank) 1998
- Assembly line alteration account pertaining to tractor factory’s
enlargement 1999
Wood- processing industry
- Planning of thermal power station’s woodchip-delivery
system (from stock to incendiary space) 1998
- Alteration planning of pulp-bale’s handling line 2003
- Alteration planning of CMC- plant’s pulp-ark feeder 2003
Other fields
- Container’s unloading- and loading-system’s account
work 2003
- Casting’s transporting system development for machining
centre 2003
- Water-hydraulics; Easycleaner- and Doublejet- unit, account
of costs 2004
Layout-planning
- CMC- production’s chemical pulp bales’ reception-,
transportation-, and handling line’s layout-planning 1998
- Plant- layout’s alteration planning for machining centre
1998
- Position- and plant layout’s update 1999
- Plant hall’s layout-planning for workshop 1999
- Compressed air- networks planning for workshop 2000
- Noise measurement laboratory’s layout-planning 2001
- Plant- layout’s update and transfer to CD 2002
- Layout-planning in 3D for plant-zone’s reception spot
premises 2003
PRODUCTION PROCESS OPTIMIZATION AND PRODUCT DEVELOPMENT; Trial
run- and testing devices
- Trial run roll of a finished tractor 1998
- Hydraulic rotator’s testing-chair for research use 1998
- Measuring- and loading wagon (adjustable to rear of tractor)
for liming friction, fuel consumption and noise measurement 1998
- Hydraulic motors’ trial run bench- planning and realization
for manufacture’s usage 1998
- Trial run bench’s alteration account pertaining to tractor
factory’s expansion 1999
- Tractor’s power transmission module’s trial run
bench’s planning and account of automation 1999
- Preliminary planning of tractor’s power transmission module’s
barring gear and loader 2000
- Noise measurement laboratory’s testing device planning
2001
- Planning and realization of hydraulic test room’s protection
screens 2001
- Planning and programming of hydraulic aggregate’s hydraulics
and automation designed for testing 2001
- Alteration planning of tractor’s power transmission module
trial run bench 2002
- Development work pertaining to pure-air cabinet’s manufacturing
technique 2002
- Account work pertaining to mechanic shaking machine’s
activity in use by product development 2002
- Account work of tractor’s power transmission module’s
testing system 2003
- Preliminary planning for the testing device of a tractor’s
starter 2003
- Planning and realization for door- and window products standard
quality grading- designed testing device 2004
- Variation for trial run aggregate’s valve block control
2004
- Preliminary planning for hydraulic pumps and motor test benches
2004
PRODUCT DEVELOPMENT
- Preliminary account for snowboard simulator 2000
- Remote drive separator’s motor control 2003
- Product development of a truck’s snow load and plowing
equipment 2004 (Development of product-documentation pertaining
to vehicle’s snow load and plowing equipment 2004, plowing
equipment’s documentation to a spare part book 2004)
- 3D- modelling 42’’- plasma display’s frisket
2004
MACHINE AND DEVICE SECURITY DOCUMENTS IN ACCORDANCE WITH EU AUTHORITATIVE
REGULATIONS
CE-label prerequisites for machines
- Documentation and training for small businesses according to
EU-regulations 2001
- Machine- and device safety in device deliveries, training for
many different businesses according to EU- regulations 2002
- Machine- and device safety in device deliveries, many training
events during 2003-2006 according to EU- regulations (TE- centres,
colleges, regional development companies)
- Machine safety according to EU-regulations; training focused
on ATEX- production spaces and explosive agent industry 2005
ATEX- explosion proof documents
- Explosion proof document Eurenco Vihtavuori Oy 2006 (Explosion
proof document was executed into thirteen different production
units. All in all, the explosion proof document dealt with 2500
different devices and device ensembles.)
OTHER TRAINING- AND CONSULTING SERVICES
- AutoCAD- training 2000
- CNC- laser cutting machine training for operating staff 2002
OUR OWN INNOVATIONS
For leisure time
- Boat terminal for rowing boats, motor boats, and sailing boats
2001
- Luomus- “Creation” snow sculpture mold; make sculptures
out of frosty snow 2002
- Movable and wheel- equipped boat roll-base for row boats 2003
- Deer- and game shooting range for air rifles; developed for
drill- and competition shooting 2003
Applied to industry
- Handling device Lakome Fix for heavy vehicle-fitting wheels;
detachment, shifting and installation 2001
- Perimeter-storage system Lakome System; automatic storage system,
that has extensive storage capacity and short platform handling
time 2004
|